Demolition Permit Checklist

For a demolition permit application, you will need to provide:

  • Demolition & plumbing contractor
  • Plumber for sewer and water disconnects 
  • Demolition / CRC / CBC / CGC
  • Duke Energy disconnect letter
  • Gas disconnect letter (if applicable)
  • Sunshine 811 ticket
  • Silt fence plan (usually marked up on a survey or aerial of property)
  • If trees are to be removed, will need the specs on them. If they are diseased, please submit an arborist report.

Inspections / after the permit is closed:

  • Pre-demo inspections: Silt fence and sewer / water cap
  • Final building inspection - once demolition and site clearing is complete
  • Once the site has been cleared, you are required to maintain the silt fence until the property has 70% coverage of soil stabilizer.